close

Under Cover

Under Cover

Parts, which are attached to the bottom of a vehicle, and have the function of protecting a car body from foreign matter on the ground when running

Product packaging and Shipping conditions

7kgs/Pallet or Carton Box.

Download related information

Product info

Business Field Market Manufacturer Department
Composites Mobility KoreaComposite R&D Center

product description

GMT(Glass fiber Mat reinforced Thermoplastics)

  • It is called reinforced thermoplastic plastic and made by reinforcing polypropylene resin and Glass Fabric mat. It is 20-25% lighter than iron while having the strength of steel and widely used as an iron alternative.

< Reliability Test >

Test item Test method Unit Category Test result Test standards
Heat resistance cycle property MS 213-51 1 No layer separation, swelling, deformation. There shall be no layer separation, swelling, deformation
Moisture resistance MS 213-51 1 No layer separation, swelling, deformation There shall be no layer separation, swelling, deformation
Oil resistance MS 213-51 1 ENGINE OIL BREAK FLUID T/M OIL

POWER STEERTING OIL

WIND SHIELD WASHER liquid antifreeze liquid

No layer separation, cracks, blisters, swelling There shall be no layer separation, swelling, deformation
Low-temperature impact resistance MS 213-51 1 No crack There should be no CRACK

< Material report >

Maker Hyundai motor company Project ASTM D2584-11
Supplier Hanwha Advanced Material Co., Ltd. Part NO. ASTM D792-13(A Method)
HKMC EO NO. MS Name (MS NO.) PP-UNDER COVER ASSEMSLY(MS213-51 TYPE S)
HKMC EO REV. (Date) MS REV NO. (DATE) 14th (2018.06.18)
MS total Test item number 12 Number of Test Items / Regulated value 0,000 units Item Numbers 12 / 12
Material / Grade MT-GF30 / StrongtLite RD 30 / Hanwha Advanced Material
Test Period 2018.07.02 ~ 2018.07.27 Production Date (LOT NO,) 2018.07.02 (201807-02)
Test Purpose Regular Test SampleType □  PROTO (Prototype)

□  PILOT (Pilot Product)

■  PRODUCT (Mass-produced)

Supply Ability

  • Process: Heating → Press → Trimming → AssemblyLead Time : 1 day

Packing & Delivery

    • Packaging Details : 7kgs

Contacts

Doojin Baek
+82-10-3684-8412
onlybback@idongsung.com

Contact supplier