Under Cover
Under Cover
Parts, which are attached to the bottom of a vehicle, and have the function of protecting a car body from foreign matter on the ground when running
Product packaging and Shipping conditions
7kgs/Pallet or Carton Box.Download related information
Product info
Business Field | Market | Manufacturer | Department |
---|---|---|---|
Composites | Mobility | KoreaComposite | R&D Center |
product description
GMT(Glass fiber Mat reinforced Thermoplastics)
- It is called reinforced thermoplastic plastic and made by reinforcing polypropylene resin and Glass Fabric mat. It is 20-25% lighter than iron while having the strength of steel and widely used as an iron alternative.
< Reliability Test >
Test item | Test method | Unit | Category | Test result | Test standards | |
Heat resistance cycle property | MS 213-51 | – | 1 | No layer separation, swelling, deformation. | There shall be no layer separation, swelling, deformation | |
Moisture resistance | MS 213-51 | – | 1 | No layer separation, swelling, deformation | There shall be no layer separation, swelling, deformation | |
Oil resistance | MS 213-51 | – | 1 | ENGINE OIL BREAK FLUID T/M OIL POWER STEERTING OIL WIND SHIELD WASHER liquid antifreeze liquid | No layer separation, cracks, blisters, swelling | There shall be no layer separation, swelling, deformation |
Low-temperature impact resistance | MS 213-51 | – | 1 | No crack | There should be no CRACK |
< Material report >
Maker | Hyundai motor company | Project | ASTM D2584-11 |
Supplier | Hanwha Advanced Material Co., Ltd. | Part NO. | ASTM D792-13(A Method) |
HKMC EO NO. | – | MS Name (MS NO.) | PP-UNDER COVER ASSEMSLY(MS213-51 TYPE S) |
HKMC EO REV. (Date) | – | MS REV NO. (DATE) | 14th (2018.06.18) |
MS total Test item number | 12 | Number of Test Items / Regulated value 0,000 units Item Numbers | 12 / 12 |
Material / Grade | MT-GF30 / StrongtLite RD 30 / Hanwha Advanced Material | ||
Test Period | 2018.07.02 ~ 2018.07.27 | Production Date (LOT NO,) | 2018.07.02 (201807-02) |
Test Purpose | Regular Test | SampleType | □ PROTO (Prototype) □ PILOT (Pilot Product) ■ PRODUCT (Mass-produced) |
Supply Ability
- Process: Heating → Press → Trimming → AssemblyLead Time : 1 day
Packing & Delivery
- Packaging Details : 7kgs
Contacts
Doojin Baek
+82-10-3684-8412
onlybback@idongsung.com
Contact supplier